    CARNIVAL CRUISE LINE

    Ship Date Description of job that was performed

    M/V Inspiration


    2004

    Fabricated a new steel foundation to fit new UPS and Transformer units.

    Removal of existing UPS foundation and catwalk floor plates and installed new floor plates and bases.

    Installed new steel doublers and protective system coatings in the pool machinery compartment.

    Renew Thermo plastic type piping; main swimming pool water supply feed line.

    Designed and Installed new machinery systems for Pool and Jacuzzi’s. (Including Pumps, Tank, Electrical and Valves.)

    Designed, fabricated and installed new supports for Jacuzzi tubs.

    2005

    Lido Galley renewal of air systems, including fabrication and installation while on board vessel.

    Performed various welding items while vessel was on operations.

    Repaired Luggage Cages.

    Installed heavier clevis into the folding mechanism.

    Renew bender side panels and renew tubing.

    Repair bender frame and base.

    2007

    Reconditioned Jacuzzi Units; refurbishment, steel works, installation and systems connections.

    Reconditioned Jacuzzi units with new coating.

    Removed and replaced all external steel foundation supports.

    Removed and replaced all plumbing fittings as original design.

    Installed new telescopic beam supports including steel center base.

    Fabricated and installed new balcony ceiling panels for all Deck 6.

    Fabricated and installed new S/Steel brackets for light balconies fixtures in deck “U” port and starboard.

    2010

    Installed new upgraded pump systems for water park systems.

    Fabricated and installed new 300 Gallon capacity tank for the Drain System.

    Fabricated, repaired and installed air intake and handrails in Deck 11 Veranda.

    Installed new Toy Systems in Deck 11 Veranda Water Park including insert plates and new watertight fittings.

    Lifeboat Davit, secured 22 pad eyes on Deck 11.

    Jacuzzi hydro test on 2 units, circuits and fittings to make sure that they are leak free.

    MV Sensation


    2006

    Fabricated and installed main pool slide staircase, handrail assembly, gutters, drains and under step covering system (water collective tank units). Fabricate units onboard the vessel.

    2008

    Fabricated and installed new balcony ceiling panels for all Deck 6.

    Fabricated and installed new S/Steel brackets for light balconies fixtures in deck “U” port and starboard.

    Fabricated new luggage cages as per new design.

    2009

    Reconditioned Jacuzzi Units; refurbishment, steel works, installation and systems connections.

    Reconditioned Jacuzzi units with new coating.

    Removed and replaced all external steel foundation supports.

    Removed and replaced all plumbing fittings as original design.

    Installed new telescopic beam supports including steel center base.

    Performed various welding and pipe fitting works for various request from the Staff Captain.

    Replace wasted main air vent steel frame insert, and install new frame. 

    Cut new vent air flow opening, fabricate new vent cover and frame. Deck 10 Midships Jacuzzi air flow vent louvers.

    Installation and fabrication, provided labor, equipment and materials to set up disconnect and remove pumps, filters and heaters. System distribution and associated manifolds and valves. Disconnected and removed machinery foundations, brackets, and grating.

    Removal and installation on new Valve systems in Deck 9.

    Provided labor, equipment, and coating to set up and manual de-scale steel deck to achieve surface condition to 2.5 prior to coating application.

    Cut to fit and install deck plating full perimeter welding and plug welds on intermediate plate surface penetrating into the existing transverse framing, work performed and approved by Lloyd's. Deck 9.

    Installed and upgraded new pool and Jacuzzi machinery systems for Deck 9.

    Installed water park tank slide pump systems.

    Deck 10 AFT.
    Provided technicians, tools, and equipment in order to set up and disconnect, removed the following equipment:
    - Pump and motor with all their   associated piping and valves.
    - Jacuzzi units’ filters and distribution manifolds.
    - Electrical heaters and piping.
    - Disconnect and remove dosage pumps and metering devices.
    - Disconnect and remove overflow   plastic tanks, after being cut in sections.
    - Disconnect all CPVC supply and   return Jacuzzi and pool piping thru deck # 10 and deck # 11 (through ceilings).
    - Disconnect and remove electrical motor controller enclosures.
    - Disconnect and remove pool dump automated pneumatic system and secure air supply line.
    - Disconnect and removed Jacuzzi units, air blower units, and foundations.

    Fabricated blanks and installed new by welding on all eliminated piping penetrations leading into the compartment. Deck 10.

    MV Triumph


    2004

    Provide labor, and equipment for the installation of a new gray water vacuum pump system, water motivated evacuation (priming) ejector.

    Install and connect water operated ejector type vacuum system on existing pump.

    Rig and transport pump unit to engine room, fabricate and install by welding one pump foundation and position.

    Fabricated complete suction pipe segment attached with suction check valve.

    Fabricated and installed suction strainer as per original design.

    Fabricated and installed discharge pipe segment attached with stop/check valve connected to overboard.

    Modified and connected one stop valve to divide suction piping in two systems.

    Fabricate brackets and installed motor starter, installed cable tray's and cable runs connecting starter and electrical motor.

    Renewed all pipe supports fastened to tank top.

    Installed vacuum gauges into the gray water suction piping to determine efficient function of system.

    Assisted electrical department staff to power feed cable from power distribution panel into the local control panel for utilization and connection into the newly installed electric motor.

    2005

    Fabricated and installed pool slide piping, including disconnection and removals.

    Fabricated, fitted and installed all section manifold, valves, and piping.

    Re-aligned and connected slide water pumps.

    Fabricated new installation slide discharge pipe line.

    Set up, penetrated deck 9, and routed thru slide column stations, up to glass elevator machinery compartment. Penetrate Aft.

    Bulkhead, new segment and connected discharge fitting into the slide.

    Fabricated and installed R/O unit with stainless steel pipe

    Installed boiler pipes and overhaul valves.

    Fabricated and installed overboard fitting and piping.

    Installed propulsion room EVAC units.

    Fabricated exhaust gas boiler feed water # 2.

    2006

    Installed new Alfa Laval unit and auxiliary system installation. Fabricated mounting foundation and oil drip pan. Install units into base, with appropriate bracket supports to ensure vibration free operation.

    Set up and installed Oily water tank 1P divisional steel bulkhead.

    Set up fabricate dedicated s/steel overboard pipe, to serve individually each pump associated with a check valve, ejector prime pipe, and flanges.

    Fabricated E.G.B, feed water # 1 piping. Installed auxiliary boiler room. Set up, disconnect, rig and remove all segments and valve manifolds, to fabrication shop deck "0". Set up target and fabricate new piping segments and manifolds

    Set up and fabricated new Cu Ni piping as original thru out deck tank top, for ballast line.

    MV Celebration


    January 23 – Feb. 11, 2005

    July 30 – August 05, 2004
    Piping works and troubleshooting of various Systems from Deck 3 to Deck 9.

    Gray water system piping works.

    MV Conquest


    August 27 – Sept. 08, 2005

    Sea chest cathelco System Installation
    Swimming pool slide.
    Piping &Pump
    Shell door Hydraulic System Hose renewals
    Anchor Windlass Gear Box Overhaul

    And Brake band Replacement

    MV Destiny


    February 14 – Feb. 29, 2004

    Installation of new gray water pumps

    System Piping and Control Valving.

    MV Valor


       

    MV Ecstasy


    January 16 - February 28, 2006


    March 01 - March 31, 2006

    April 2006

    December 6 - December 22, 2005





    December 2005 - January 2006


    October 2004
    Fabrication and installation of new gray water line.

    Provided service technicians.

    Provided service technicians.

    Deck and coaming, Lido restaurant aft.
    Repair mooring deck damaged hatches.
    Port and starboard side overboard side, balcony steel bulkhead support.

    Rebuilding frame overboard valves.
    Rebuild fresh water pipe and ballast.

    Main pool slide removal and installation.
    Pool and Jacuzzi machinery rooms renovations.
    Steel window frames

    MV Fantasy


    September 12 - October 04, 2005 Glass window steel framing installation and fabrication.
    Lifeboat Pan replacement.
    Electric motor automation enclosure units.
    Lido Pool jacuzzi machinery and pumps.
    Promenade Air water circuit work.
    Pool machinery compartment.
    Steel decking and drains.

    MV Elation


       

    MV Spirit


       

    MV Destiny


       

    MV Glory


    August 10, 2004



    January 07 - January 21, 2005

    F.W Bunkering pipe, weld joints and reconditioning.
    Scrubber tank vent pipe.

    Anchor windlass mechanical repairs.
    Sea chest cathodic protection.
    Shell door and mooring deck hatches.
    Pool zinc anode installation.

    MV Holiday


    February 05 - March 26, 2006 Hot, cold, technical and recirculating vertical and horizontal lines.
    Replacement main system manifold valves.
    Water line insulation.

    MV Pride


       

    MV Imagination


    September 06 - September 22, 2004 Pool and Jacuzzi machinery.
    Main pool drain pipe.
    Pool machinery compartment deck, protective system covering.

    ROYAL CARRIBEAN CRUISES LTD.
    Horizon
    Fresh Water(potable) tank coating works (Vessel at operation)
    Surface recondition and coating of portable water tank
    Gray water tank abrasive blast provided labor and materials

    Zenith
    Galley entance - recessed applied mat
    Surface recondition & Coating of potable water tanks

    Century
    Hydraulic System
    Renovation and Outfitting during dry docking of vessel
    Tender Platforms

    Explorer of the Seas
    Renew and Calibration of Viscosity Control System

    Galaxy
    Turbocharger Air Coolers
    Century
    Mercury
    Millennium

    Crystal Cruises
    Crystal Harmony
    Crystal Serenity
    Crystal Symphony


    BC Ferries

    Discovery Cruise Line

    International Maritime Ship Agents Corporation

    MMS International

    Seaboard Ship Management

    Sergeant Marine

    Tropical Shipping

    V. Ships

    NCL




  • Maritime Shortcuts
    Home
    Industrial Products
    Marine Products
    Request A Quotation
    Contact Us